|
|
Within five years from take-off, NPCC was fully established as a leading Contracting outfit and had to its credit completion of some large Projects in Pakistan i.e. Electrification of SCARP Tube wells, 132kV Substations and Transmission Lines, Gas Turbine Power Plants, Industrial and Rural Electrification.
|
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
Having raised a strong professional management and solid home base, NPCC started knocking at the foreign market. The break-through came in 1977 with the award of the first major Project in Saudi Arabia and during the next over two decades NPCC was able to secure many more. Among these, on turnkey contract basis, were one of the largest Central Electrification Scheme and a Rural Distribution Project ever undertaken in Saudi Arabia. The rise of NPCC as a Contracting force was so phenomenal that in 1982 "The Engineering News Record(ENR)" rated it among the top 50 International Design-Construct Outfits. In 1989 NPCC was again in the bank of top 100 International Contractors.
|
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
These include construction of 380kV, 132kV and 110kV transmission lines,
132kV/110kV Underground Cable Networks, 33kV and 13.8kV Distribution Networks, 132kV / 33kV Substations and Gas Turbine Power Stations, all on Design-Construct basis with related civil works and services etc. |
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
|
| Home | Company Profile | Corporate Structure | Charter of Services | |
|
| Performance Record | Project Summary | Clients & References | Contact us | |
|
Copyright © 2002- 2006 NPCC, Designed by webtechnos.net. |